Skip to main content
Free Delivery Over $499*
Discreet Shipping
3000+ Products
140K+ Orders Dispatched

Hortitek Light Management Unit (LMU) - 8 Outlet | 8On | 8000W | 60A | 1 Phase

SKU: CTRL10102
|

ETA: 1-3 Weeks

Hortitek Light Management Unit (LMU) - 8 Outlet | 8On | 8000W | 60A | 1 Phase

FREE SHIPPING OVER $499*

REG. PRICE: $450.00
$349.95
Qty:

Pick up at store Free

Delivery Options:

If cart total is less than $499*

Freight applies

If cart total is $499* & above

Free

*excluding bulky items

International shipping

Click here

SECURE PAYMENTS WITH

Afterpay Logo

BUY NOW, PAY LATER

Pay in 4, interest-free. Afterpay it.

Zip Logo

ZIP NOW, PAY LATER

Repay on a convenient weekly, fortnightly or monthly schedule.

Paypal Logo

ENJOY NOW, PAY LATER

The Hortitek Light Management Units are a secure and effective solution for controlling your lighting system. It is important to note that these units must be installed by a licensed electrician, and come in various sizes to fit your particular requirements. These units are constructed with premium components, ensuring durability and long-lasting performance when used properly. Additionally, they are housed in an enclosure that is resistant to ultraviolet light, and are equipped with a timer to adjust the operating hours to your desired schedule, as well as a safety switch for added protection.

Recommendation:

  • 315/400W Lamp - Max Qty: 20
  • 600/630W Lamp - Max Qty: 16
  • 800W Lamp - Max Qty: 12
  • 1000W Lamp - Max Qty: 8

Specifications

  • Phase:
  • Max Amps: 60 
  • Continuous Amps: 48 
  • Note: This LMU can supply up to 48 A load for 24 hrs operation
  • Voltage: 240 VAC
  • Frequency: 50 Hz

In The Box

  • [1] x Hortitek Light Management Unit (LMU) - 8 Outlet | 8On | 8000W | 60A
  • Top-quality components
  • Built-in timer
  • UV protected enclosure
     

Installation Instructions:

  1. All electrical items must be installed by a licensed electrical contractor.
  2. Check LMU Voltage and Wattage Rating before connecting to any supply.
  3. Loosen screws for each of the joiners. Connect the Neutral (Black wire) from the LMU to the supply Neutral and RED wires to Active Ensure that no bare copper wire protrudes from outside of the joiner. If so, shorten the stripped wire prior to tightening.
  4. Ensure that the joiner is generously taped and that wires are double insulated with tape and each wire is individually taped away from each other.
  5. Connect the supply earth (green and yellow wire) to earth terminal provided on the top of the LMU.
  6. Prior to commissioning, plug in the auxiliary lead (grey lead) into a 10 Amp socket and test the LMU.
  7. Set 24 Hrs Timer to desired ON/OFF time before switching Auxiliary supply.
  8. Read all the warnings on LMU before commissioning.

1-Year Replacement Warranty

  • If the product is faulty within the warranty period, the product will be replaced with a new one.
  • Please send the product to the following address on the contact us page.